Supply and installation of 4 WNRS flexible systems, 2022

Project background: By December 2019, Enviroearth had already replaced the stainless steel vaults on site. These vaults house all the equipment and electrical components essential for data collection.

In August 2022, our team returned from Bermuda after a two-week stay dedicated to the supply and installation of four flexible surface wind noise reduction systems (WNRS).

As part of a framework contract, our customer wanted to replace the old systems with more robust, high-performance models. Enviroearth installed these four WNRS systems on four separate sites. Each installation was thoroughly tested for leaks, before commissioning in the presence of the station operator, our customer and our team.

For this project, Enviroearth designed and assembled the equipment in its Saint-Cannat workshop, then took charge of shipping it to site. Thanks to the cooperation of the plant operator, the project was delivered on schedule.