Enviroearth

Time to quantify


Hybrid system conventional

Hybrid system conventional/solar energy up to 300kWp: Schools, hospitals, administrative buildings, resorts, industrial and tertiary buildings

Some buildings require a reliable and permanent supply of electricity, which is difficult to achieve with a 100% renewable installation. In this case, system hybridization between conventional energy and renewable energy makes sense.
It allows a good compromise between plant performance and limiting the environmental impact.

Enviroearth proposes to guide you to find the solution that will best meet your needs. Our team will carry out a study including:
  • Analysis of your current power supply
  • A financial and environmental study on the impact of the addition of solar electricity in your installation
  • The size of the renewable energy source (type of solar panels, peak power, orientation, mounting)
  • Choosing the right type of power generator (rated power, fuel choice)
  • Connection or not to the grid, according to its reliability and its proximity to the installation
When a technical solution is decided in agreement with you, our teams will monitor the work during every step of building your hybrid network, to provide you with a suitable, reliable, efficient turnkey solution:
  • Purchase and supply of equipment, including transportation and customs formalities
  • Monitoring of preparatory work for the installation (civil engineering)
  • Installation supervision
  • Commissioning of the hybrid system
  • Economic and environmental gain monitoring

PROJECTS

Environmental
monitoring
Renewable
energy
Integrator of low-carbon
solutions
  • Operation and maintenance of a scientific station on Saint-Helena since 2006

    Learn more
  • Design, operation and maintenance of infrasound stations

    Learn more
  • Operation and maintenance of a scientific station on Maio Island since 2006

    Learn more
  • Renewable energies and Wastewater treatment in developing countries

    Learn more
  • Renewable energies, Water and Waste treatment for isolated sites

    Learn more
  • Installation of a solar farm on Tristan Da Cunha in 2015

    Learn more
  • Operation and maintenance of a scientific station on Tristan Da Cunha since 2006

    Learn more
  • Continuous measurement of atmospheric CO2 over Paris, in 2015

    Learn more
  • Maintenance of the IMS scientific station in Rabaul, Papua New Guinea, since 2013 and ongoing

    Learn more
  • Solar electrification of 15 rural schools in Madagascar, 2015

    Learn more
  • Project “Weather at School” in France, installation of a network of 40 weather stations, 2014 – 2017

    Learn more
  • Design, supply, installation and maintenance of 11 solar farms in the Maldives

    Learn more
  • Design and installation of fixed or mobile solar containers

    Learn more
  • Mapping of the natural magnetic field through on-site measurements in 6 areas of Tristan Da Cunha Island, 2009

    Learn more
  • Installation of a scientific station measuring magnetic field on Tristan Da Cunha, 2010

    Learn more
  • Installation, operation and maintenance of a Noble Gas measuring station on Tristan Da Cunha, 2009

    Learn more
  • Operation and maintenance of a scientific station on Saint-Helena since 2006

    Learn more
  • Design, operation and maintenance of infrasound stations

    Learn more
  • Operation and maintenance of a scientific station on Maio Island since 2006

    Learn more
  • Operation and maintenance of a scientific station on Tristan Da Cunha since 2006

    Learn more
  • Continuous measurement of atmospheric CO2 over Paris, in 2015

    Learn more
  • Maintenance of the IMS scientific station in Rabaul, Papua New Guinea, since 2013 and ongoing

    Learn more
  • Project “Weather at School” in France, installation of a network of 40 weather stations, 2014 – 2017

    Learn more
  • Design, supply, installation and maintenance of 11 solar farms in the Maldives

    Learn more
  • Mapping of the natural magnetic field through on-site measurements in 6 areas of Tristan Da Cunha Island, 2009

    Learn more
  • Installation of a scientific station measuring magnetic field on Tristan Da Cunha, 2010

    Learn more
  • Installation, operation and maintenance of a Noble Gas measuring station on Tristan Da Cunha, 2009

    Learn more
  • Installation of a solar farm on Tristan Da Cunha in 2015

    Learn more
  • Solar electrification of 15 rural schools in Madagascar, 2015

    Learn more
  • Design, supply, installation and maintenance of 11 solar farms in the Maldives

    Learn more
  • Renewable energies and Wastewater treatment in developing countries

    Learn more
  • Renewable energies, Water and Waste treatment for isolated sites

    Learn more
  • Design and installation of fixed or mobile solar containers

    Learn more

OTHER SKILLS

RENEWABLE ENERGY DEPLOYMENT

Centrales Solaires photovoltaïques
de 5 à 2000 kWc reliées au réseau

Systèmes électriques
autonomes jusqu’à 300 kWc

Fields of expertise